Projects:
A14 / Cambridge & Lincolnshire, UK
EMJ Plastics worked closely with the A14 Integrated Delivery Team to design and manufacture our GRP Permadec Panels to 19 different structures.
Key facts:
- EMJ Plastics supplied 19no of different structures from 2017 - 2019
- Structures involved a range of precast and steel bridges
- Lifting holes were included in the panels to allow for quick installation using a lifting frame
- On both precast and steel structures panels where sent to the beam suppliers to allow for beams to be landed with Permadec already installed
- Bespoke panels were made for each bridge structure
Project: A14 Cambridge to Huntingdon
Employer: A14 Integrated Delivery Team
Contractor: A14 Integrated Huntingdon to Delivery Team
Stage: Completed